The good progress continued in January. As at 21 January:
The rear initial terrace work was completed so that some of the rubble could be held in the retaining walls.
 |
| Where did the lawn go? |
The limestone facing was delivered from the quarry:
 |
The team had a big job getting them all dressed - it sounded (and looked) like a Victorian penal colony!
|
Some serious demolition was done above the old dining room - the roof was completely removed and the doorway to the planned mezzanine knocked through:
The steel joists were also delivered and the first fitted above the dining room to take the mezzanine bridge:
Worried about my right to light😉